General Beton is always considering new construction methods. Being part of a growing city with density increasing and space being a premium, we are becoming limited on site for concrete pumps. This is especially the case for Mobile boom pumps, so we have invested into the usage of onsite placing booms. Once installed in central location the benefits of coverage, increase production and decrease manual handlings in turn providing improvement to site efficiency.
As a result, pumping locations are reduced to a minimal footprint. As an example, Trailer and Skid pumps will need half the area to set up than a mobile line pump or a third of the area of a mobile boom pump. Washout areas are kept to a confined and controlled area. With the appropriate planning and consultation process, what were once concerning issues for our clients are now just part of the construction process.
Ask us how we can use this system on your next project! Contact Us Here.
The Team at General Beton.